Total Pageviews

Showing posts with label n scale. Show all posts
Showing posts with label n scale. Show all posts

Thursday, March 30, 2023






A little boredom side project.... 

Micro Engineering N scale Gas Station. This is the complete kit. I've had it for awhile, figured I'd build it for the fun of it. 

 

Monday, September 26, 2011

Update.. Reefer madness and cork on the mainline!!!

I know, about time I updated. Well, with my work schedule and other things going on, it's been tough to get anything done. It's also the time of the year when I start woodworking again as well. So, without further ado, on with the update...

Picked up two of BLMA's killer reefers. Train Shack in North Hollywood had several when I was in the area, so I couldn't help it. These are nice. They'll get full weathering and graffiti shortly, but I had to run them. Luckly, the GEHAMS club was having a run this weekend.







I also got the cork down on the upper deck. Next is the track and wiring. Then I'll figure out what I want to do with the industries. As it is right now, I'm leaning to maybe 4-7 various industries. After the trip up north, I'm also going to model more of the NorCal-Oregon area.







I should have it running this week, if I'm lucky.
Published with Blogger-droid v1.7.4

Monday, August 29, 2011

Round and round...

Well, after spending all weekend finishing off the staging yard, I started on the west loop. I'm figuring this will be a 1 turn helix to climb up to the upper level. I'm giving serious thought to installing the upper section first, then linking the helix up to it. I'm still giving thought to the backdrop as well. Right now the thought is 1x2's off the back and either plastic or masonite for the backdrop.






Published with Blogger-droid v1.7.4

Sunday, August 28, 2011

Staging done!

With a quiet weekend and no obligations, I got to finish my staging yard this afternoon. Now to take a moment and wire it up. Maybe I'll get a train running this week....

Published with Blogger-droid v1.7.4

Friday, August 19, 2011

Last of the benchwork... For now..

Finally got the last of my benchwork up and installed. Moved the paintbooth to its new home, so now I can get down to finishing the line.



Also, I finished installing the east end of the staging yard. Blue Points are being used for switch control and power routing...

Published with Blogger-droid v1.7.4

Tuesday, August 16, 2011

More benchwork...

More west side benchwork went up today. My layout room is 11' 7" wide. This piece fit managed to fit right in. Now to just finish cleaning up where the paint booth is to move and I'm ready to install the last section.

BTW, yes, that's a wig-wag signal. It's from the Pacific Electric crossing of Alameda street in Los Angeles. One of my projects is to get it cleaned up, repainted and rewired so it can be lit.




Published with Blogger-droid v1.7.4

Sunday, August 14, 2011

East end staging...

Well, the east end ladder is in for staging. Thanks to my buddy Doug for the loan of his compressor, I can get a lot of benchwork done alot quicker..




Now to start installing yard tracks..
Published with Blogger-droid v1.7.4

Wednesday, August 10, 2011

Bridge and tie gang....

So after coming home and getting to bed late, I wound waking up 3 hours later. Since I wasn't going to be able to get back to sleep, I figured I'd get the bridge in.





Now that it's in, I'll start laying track into the staging yard.
Published with Blogger-droid v1.7.4