Total Pageviews

Showing posts with label layout. Show all posts
Showing posts with label layout. Show all posts

Wednesday, September 7, 2022

Well..

 


So I got six modules built. They are the curves for a show layout. Basically they are 9x16 inch boxes, made from 1/4 pine boards and some 1/4 ply. Nothing fancy or expensive. They have leveling feet on them so I can adjust for bad table tops or what have you. 

Next step is roadbed and track. Started working on that last night. 


First turnout I've made in over 15 years. It's ugly but it'll do. I need two rights and a wye. After that we should be good. 

Monday, September 26, 2011

Update.. Reefer madness and cork on the mainline!!!

I know, about time I updated. Well, with my work schedule and other things going on, it's been tough to get anything done. It's also the time of the year when I start woodworking again as well. So, without further ado, on with the update...

Picked up two of BLMA's killer reefers. Train Shack in North Hollywood had several when I was in the area, so I couldn't help it. These are nice. They'll get full weathering and graffiti shortly, but I had to run them. Luckly, the GEHAMS club was having a run this weekend.







I also got the cork down on the upper deck. Next is the track and wiring. Then I'll figure out what I want to do with the industries. As it is right now, I'm leaning to maybe 4-7 various industries. After the trip up north, I'm also going to model more of the NorCal-Oregon area.







I should have it running this week, if I'm lucky.
Published with Blogger-droid v1.7.4

Saturday, September 17, 2011

Okay, layout update....

So here's some shots of the layout. Were starting from the west end to the east end.



This the west end helix. I'm using 2 turns to get the main up to where it needs to be. The reason for the riders being so long is for the climb for the branch line.





This is the bulk of the layout. Stqging is in, but wiring is currently under way. That should be finished by the time you read this. So far, nothing has had a problem.



The east end climb. I planned for trains with 3 engines on the point, or 2 and a rear end helper. Looks like I managed to get that to work without too much heatburn. 3 UP Aces with 26 cars look good too!

Tomrrow, I should start working my way across the upper level and finish the mainline.
Published with Blogger-droid v1.7.4

Sunday, August 14, 2011

East end staging...

Well, the east end ladder is in for staging. Thanks to my buddy Doug for the loan of his compressor, I can get a lot of benchwork done alot quicker..




Now to start installing yard tracks..
Published with Blogger-droid v1.7.4