Total Pageviews

Showing posts with label benchwork. Show all posts
Showing posts with label benchwork. Show all posts

Wednesday, September 7, 2022

Well..

 


So I got six modules built. They are the curves for a show layout. Basically they are 9x16 inch boxes, made from 1/4 pine boards and some 1/4 ply. Nothing fancy or expensive. They have leveling feet on them so I can adjust for bad table tops or what have you. 

Next step is roadbed and track. Started working on that last night. 


First turnout I've made in over 15 years. It's ugly but it'll do. I need two rights and a wye. After that we should be good. 

Saturday, September 17, 2011

Okay, layout update....

So here's some shots of the layout. Were starting from the west end to the east end.



This the west end helix. I'm using 2 turns to get the main up to where it needs to be. The reason for the riders being so long is for the climb for the branch line.





This is the bulk of the layout. Stqging is in, but wiring is currently under way. That should be finished by the time you read this. So far, nothing has had a problem.



The east end climb. I planned for trains with 3 engines on the point, or 2 and a rear end helper. Looks like I managed to get that to work without too much heatburn. 3 UP Aces with 26 cars look good too!

Tomrrow, I should start working my way across the upper level and finish the mainline.
Published with Blogger-droid v1.7.4

Monday, August 29, 2011

Round and round...

Well, after spending all weekend finishing off the staging yard, I started on the west loop. I'm figuring this will be a 1 turn helix to climb up to the upper level. I'm giving serious thought to installing the upper section first, then linking the helix up to it. I'm still giving thought to the backdrop as well. Right now the thought is 1x2's off the back and either plastic or masonite for the backdrop.






Published with Blogger-droid v1.7.4

Tuesday, August 16, 2011

More benchwork...

More west side benchwork went up today. My layout room is 11' 7" wide. This piece fit managed to fit right in. Now to just finish cleaning up where the paint booth is to move and I'm ready to install the last section.

BTW, yes, that's a wig-wag signal. It's from the Pacific Electric crossing of Alameda street in Los Angeles. One of my projects is to get it cleaned up, repainted and rewired so it can be lit.




Published with Blogger-droid v1.7.4