More work on the layout tonight. However, I do have a cool photo from a trip I made out on the other side of town. This SOO boxcar was sitting in the UP yard with about 50 other boxcars. Must be getting ready for cotton season...
Building narrow gauge trains, 1/35th scale armor and 1/24th trucks, depending on what day of the week it is.
Total Pageviews
Saturday, September 17, 2011
Sunday, September 4, 2011
Traveling...
On the road this weekend. The family is in Idaho for 5 days of rest. Some pictures attached...
More next week. Gonna do some railfanning between Sandpoint and Spokane.
More next week. Gonna do some railfanning between Sandpoint and Spokane.
Published with Blogger-droid v1.7.4
Monday, August 29, 2011
Round and round...
Well, after spending all weekend finishing off the staging yard, I started on the west loop. I'm figuring this will be a 1 turn helix to climb up to the upper level. I'm giving serious thought to installing the upper section first, then linking the helix up to it. I'm still giving thought to the backdrop as well. Right now the thought is 1x2's off the back and either plastic or masonite for the backdrop.




Published with Blogger-droid v1.7.4
Sunday, August 28, 2011
Staging done!
With a quiet weekend and no obligations, I got to finish my staging yard this afternoon. Now to take a moment and wire it up. Maybe I'll get a train running this week....
Published with Blogger-droid v1.7.4
Tuesday, August 23, 2011
Getting there...
Sub roadbed in.. got some of the cork and track down as well. I'm thinking of a helix on the end to get back to the upper level.
Hopefully, I'll have it up and running by the weekend.
Hopefully, I'll have it up and running by the weekend.
Published with Blogger-droid v1.7.4
Friday, August 19, 2011
Last of the benchwork... For now..
Finally got the last of my benchwork up and installed. Moved the paintbooth to its new home, so now I can get down to finishing the line.
Also, I finished installing the east end of the staging yard. Blue Points are being used for switch control and power routing...
Also, I finished installing the east end of the staging yard. Blue Points are being used for switch control and power routing...
Published with Blogger-droid v1.7.4
Tuesday, August 16, 2011
More benchwork...
More west side benchwork went up today. My layout room is 11' 7" wide. This piece fit managed to fit right in. Now to just finish cleaning up where the paint booth is to move and I'm ready to install the last section.
BTW, yes, that's a wig-wag signal. It's from the Pacific Electric crossing of Alameda street in Los Angeles. One of my projects is to get it cleaned up, repainted and rewired so it can be lit.
BTW, yes, that's a wig-wag signal. It's from the Pacific Electric crossing of Alameda street in Los Angeles. One of my projects is to get it cleaned up, repainted and rewired so it can be lit.
Published with Blogger-droid v1.7.4
Subscribe to:
Posts (Atom)










